Area 2: Gloucester Street, Goodiers Drive, Robert Hall Street
Gloucester Street
The proposals aim to improve pedestrian safety and manage traffic flow at Gloucester Street and its junctions.

Pedestrian Improvements
- Raised junction with uncontrolled crossing points for safer pedestrian movement.
Traffic Calming
- Traffic calming measures introduced to reduce vehicle speeds.
- Parking restrictions maintained or introduced to prevent obstruction and improve visibility.
Road Works
- Resurfacing of carriageway for better road quality.
- Footway improvements for accessibility.
Goodiers Drive
The proposals aim to improve pedestrian safety, manage traffic speed, and enhance the streetscape along Goodiers Drive and its connecting roads.

Pedestrian Improvements
- Footway widened to 2.5m for better accessibility and comfort.
- Raised uncontrolled crossings introduced for safer pedestrian movement.
- Additional uncontrolled crossings for improved connectivity.
Traffic Calming
- Traffic calming measures proposed to reduce vehicle speeds.
Green Infrastructure
- SuDS planting beds (Sustainable Drainage Systems) added to manage rainwater and improve biodiversity.
- Additional planting areas for a greener environment.
Public Transport
- Existing bus stops retained for continuity of service.
Robert Hall Street
The proposals aim to improve pedestrian safety, upgrade bus stop accessibility, and manage parking and traffic along Robert Hall Street and its connecting roads.
Robert Hall Street Proposals Plan 1 of 2

Robert Hall Street Proposals Plan 2 of 2

Pedestrian Improvements
- Raised junctions introduced for safer pedestrian movement.
- Raised zebra crossing added for visibility and safety.
- Additional uncontrolled crossings for improved connectivity.
Public Transport
- Existing bus stops upgraded to level access for better accessibility (subject to developer agreement).
Traffic Calming
- Traffic calming measures proposed to reduce vehicle speeds.
Parking
- Parking to remain in some areas.
- Parking restrictions introduced: maximum stay of 3 hours, no return within 1 hour.
Road Works
- Resurfacing of carriageway for improved road quality.
- Footway improvements for accessibility.
